Bitcoin Implementation Consolidation Plan¶
[AIR-3][AIS-3][BPC-3]
Implementation Schedule¶
This document outlines the specific implementation steps for the Bitcoin consolidation process, following the strategy defined in CONSOLIDATION_STRATEGY.md.
Phase 1: Core Structure Validation¶
Status: In Progress
Tasks:¶
- ✅ Create consolidated branch and strategy document
- ⏳ Validate existing hexagonal architecture components
- Ensure all required directories exist with proper structure
- Verify port interfaces are properly defined
- Check adapter implementations
- ⏳ Create implementation stubs for missing components
- Fill in directory structure where needed
- Create interface placeholders for future implementation
Components to Validate:¶
- anya-bitcoin/ports/
- anya-bitcoin/adapters/
- anya-bitcoin/core/ (structure only)
- anya-bitcoin/layer2/ (structure only)
Phase 2: Core Bitcoin Implementation¶
Status: Planned
Tasks:¶
- ⏳ Consolidate BIP-341 (Taproot) implementation
- Merge consensus rules
- Integrate validation logic
- Update documentation
- ⏳ Consolidate BIP-342 (Tapscript) implementation
- Merge script execution logic
- Integrate validation logic
- Update documentation
- ⏳ Implement consensus rules with proper validation
- ⏳ Implement script interpreter with test cases
- ⏳ Implement transaction validation components
Source Components:¶
- feature/bitcoin-core: For core implementation details
- feature/bitcoin-implementation: For implementation-specific logic
Phase 3: Layer 2 Protocol Integration¶
Status: Planned
Tasks:¶
- ⏳ Consolidate RGB protocol implementation
- Integrate client and node components
- Merge schema definitions
- Update wallet integration
- ⏳ Consolidate DLC implementation
- Merge adaptor signatures
- Integrate contract execution
- Update oracle component
- ⏳ Consolidate Lightning components
- Integrate with core Bitcoin functionality
- Update channel management
- Verify BOLT compliance
- ⏳ Consolidate RSK bridge implementation
- Update federation logic
- Integrate contract execution
- Verify bridge security
Source Components:¶
- feature/bitcoin-layer2: For all Layer 2 protocol implementations
Phase 4: Testing Infrastructure¶
Status: Planned
Tasks:¶
- ⏳ Consolidate unit tests for all components
- ⏳ Integrate BIP compliance tests
- ⏳ Set up benchmarking infrastructure
- ⏳ Create integration test suite
- ⏳ Implement continuous integration hooks
Source Components:¶
- feature/bitcoin-testing: For comprehensive test suite
- All feature branches: For component-specific tests
Phase 5: Documentation & Compliance¶
Status: Planned
Tasks:¶
- ⏳ Update all module documentation
- ⏳ Verify BIP implementation status documentation
- ⏳ Create consolidated API documentation
- ⏳ Verify compliance with Bitcoin Development Framework v2.5
- ⏳ Prepare final PR with implementation checklist
Timeline¶
- Phase 1: 1-2 days
- Phase 2: 2-3 days
- Phase 3: 2-3 days
- Phase 4: 1-2 days
- Phase 5: 1 day
Total: 7-11 days
Implementation Updates¶
This section will be updated as implementation progresses.
Updates:¶
- 2025-05-02: Created consolidation branch and strategy
- 2025-05-02: Created implementation plan